Berth Information of the Port (17-2)

Company

Berth

Length

Quay

Length

Cargo

Types

Quay Crane

No.1 Branch

15

2833 m

13.5

Bulk Cargo

29

No.2 Branch

1

412 m

19

Iron Ore

3

No.3 Branch

6

1168 m

12.3

Metal Ore, Bulk Cargo

15

No.4 Branch

3

448 m

9.7

Bulk Cargo

6

The ZPG

12

1817 m

23.2

Oil, Bulk Cargo, Wood Chip

51

Container Company

2

396 m

11.3

Container

3

The “Three Important Projects�in Port of Zhanjiang, namely 300, 000 dwt crude oil terminal, 250,000 dwt ore berth and the deepwater navigation channel, was started in 1999. The 300, 000 dwt crude oil terminal, one of the largest dedicated crude oil terminals in the mainland of China, was completed and put into use in 2002. The 250, 000 dwt ore terminal, one of the largest specialized iron ore terminals in South China, was put into operation in July, 2005.

  Crude oil terminal for vessels of 300,000 dwt

Iron ore terminal for vessels of 250,000 dwt


(October 08,2008)