>> Home / Technology / Data
Tool : Home | Print | Back to
Capacity of the iron ore terminal and crude oil terminal (17-3)

 

Terminal

Designed Handling Capacity

 

Length

 

Equipment

 

Efficiency

Day

Handling Capacity

Iron Ore

85million tons/year

330m

3gantry-grabbing unloaders

2250 tons/hour/each

>80, 000 tons/day

Crude Oil

15.24million tons/year

470m

2 oil loading pipes

2500 tons/hour/each

>150, 000 tons/day

Land: The port covers 5.95 sq km. The details are as follows.


(October 08,2008)

Tool : Home | Print | Back to
Photo Gallery